KembaliArsip / superapp-tech / vercel-management
superapp-tech

vercel-management

15 file · 1.8 MB

Sistem informasi live — vercel-management-phi.vercel.appBuka di tab baru

README

Vercel Project Management

Static dashboard for the subkhan-ibnu-ajis-projects Vercel team. The page is a sanitized operational snapshot generated on Selasa, 19 Mei 2026 pukul 14.13 from Vercel CLI/API data.

Current Snapshot

  • Total projects: 106
  • Production ready: 93
  • Need attention: 13
  • Custom-domain projects: 11
  • Web Analytics active indicators: 106
  • Speed Insights active indicators: 105
  • Apps Tools cleanup decisions migrated: 40
  • Sensitive public-open blocks: 1 (macbokstorage)

Safety Notes

This repository intentionally stores only safe project metadata: names, public/deployment URLs, dashboard links, framework, node version, repo references, status, alias counts, and environment-variable counts. It does not store environment values, encrypted payloads, tokens, creator emails, or raw API responses.

The cleanup decision section was migrated from Apps Tools on 2026-05-19. Apps Tools now redirects /vercel-projects to the live Vercel Management page so this repo is the canonical Vercel cleanup surface.

Cleanup Scope

  • Keep active apps standalone.
  • Keep finance consolidation in ekonomi-finance, not Apps Tools.
  • Treat macbokstorage as sensitive-private and block public site/repo open actions in the dashboard UI while keeping the Vercel dashboard link for authenticated management.
  • Do not archive/delete any project before checking Vercel domains, env vars, traffic, owner, and latest production deployment.

Billing & Usage Management

A dedicated billing.html page is now included. It aggregates:

  • Executive summary: plan status, credit usage, upcoming invoice, on-demand charges.
  • Usage by resource: breakdown with visual bar charts (Build CPU Minutes, Functions, Observability, etc.).
  • Usage by project: cost contribution and last-activity tracking for the top consumers.
  • Risk register: current risks and downgrade-risk matrix with mitigation controls.
  • Domains, stores & integrations: hubrumah.com, bangkim.com, heyibnu.com, Blob Store, Braintrust/Neon.
  • Recommendations: must-do actions, things to avoid, daily monitoring checklist.
  • Downgrade analysis: Pro → Hobby feasibility, questions for Vercel Billing Support, and a draft support message.
  • Full audit PDF: embedded viewer + download link for the laporan_audit_vercel_zero_loss.pdf.

Snapshot date for billing data: 20 Mei 2026.

Quota Forecast

A dedicated quota.html page is now included. It turns the live Vercel usage analysis into an accessible forecast page at /quota when deployed with cleanUrls.

  • Live Hobby snapshot: plan label, current quota usage, and highest-risk resource.
  • Executive insight: conclusion-first reading of what the collected usage data means operationally.
  • Prediction model: quiet, base, and spike scenarios using 30-day history plus recent burn rates.
  • Forecast by resource: Fluid Active CPU, Build Time, Edge Requests, Function Invocations, transfers, ISR, and image usage.
  • History & drivers: previous cycle cost/usage signals and project-level contributors.
  • Action plan: daily guardrails and triggers for freeze, optimization, or temporary Pro fallback.

Snapshot date for quota forecast: 29 Mei 2026.

Credit Optimization

A dedicated optimization.html page for maximizing remaining Vercel Pro credit in the final 7 days before billing cycle ends. It contains:

  • Executive summary: current plan, credit used, remaining credit, on-demand status.
  • Billing safety check: Pause Projects status, on-demand budget, guardrail verification.
  • Global usage audit: Build CPU, Function Invocations, GB-Hours, Bandwidth, Observability, Blob, Cron, Data Cache.
  • Top cost drivers: resource breakdown and project-level cost attribution.
  • All 100 projects audit: with framework, domain, last deploy, status, priority ranking.
  • Top 7 priority projects: selected by custom domain, value, and productive credit usage potential.
  • Skip list: projects that should not be touched to avoid wasting credit.
  • 7-day plan: daily focus, target credit usage, validation steps, stop conditions.
  • Productive utilization strategy: approved actions vs. prohibited actions.
  • Integration audit: Braintrust, Neon, Blob, domains, and downgrade risk analysis.
  • Downgrade preparation: Hobby limits comparison, timing recommendation.
  • Support ticket draft: ready-to-review downgrade inquiry for Vercel Billing Support.
  • Daily checklist: billing, usage, and production health monitoring.
  • Action approval matrix: what needs user confirmation before execution.

Snapshot date for optimization data: 21 Mei 2026.

Useful Links

File Utama

  • .gitignore
  • CHANGELOG.md
  • DEPLOYMENT_PROTECTION_REPORT.md
  • DEPLOYMENT_VERIFICATION_REPORT.md
  • README.md
  • billing.html
  • efficiency-report.html
  • gov-project-testing-web-all-deployments.json