vercel-management
15 file · 1.8 MB
README
Vercel Project Management
Static dashboard for the subkhan-ibnu-ajis-projects Vercel team. The page is a sanitized operational snapshot generated on Selasa, 19 Mei 2026 pukul 14.13 from Vercel CLI/API data.
Current Snapshot
- Total projects: 106
- Production ready: 93
- Need attention: 13
- Custom-domain projects: 11
- Web Analytics active indicators: 106
- Speed Insights active indicators: 105
- Apps Tools cleanup decisions migrated: 40
- Sensitive public-open blocks: 1 (
macbokstorage)
Safety Notes
This repository intentionally stores only safe project metadata: names, public/deployment URLs, dashboard links, framework, node version, repo references, status, alias counts, and environment-variable counts. It does not store environment values, encrypted payloads, tokens, creator emails, or raw API responses.
The cleanup decision section was migrated from Apps Tools on 2026-05-19. Apps Tools now redirects /vercel-projects to the live Vercel Management page so this repo is the canonical Vercel cleanup surface.
Cleanup Scope
- Keep active apps standalone.
- Keep finance consolidation in
ekonomi-finance, not Apps Tools. - Treat
macbokstorageas sensitive-private and block public site/repo open actions in the dashboard UI while keeping the Vercel dashboard link for authenticated management. - Do not archive/delete any project before checking Vercel domains, env vars, traffic, owner, and latest production deployment.
Billing & Usage Management
A dedicated billing.html page is now included. It aggregates:
- Executive summary: plan status, credit usage, upcoming invoice, on-demand charges.
- Usage by resource: breakdown with visual bar charts (Build CPU Minutes, Functions, Observability, etc.).
- Usage by project: cost contribution and last-activity tracking for the top consumers.
- Risk register: current risks and downgrade-risk matrix with mitigation controls.
- Domains, stores & integrations: hubrumah.com, bangkim.com, heyibnu.com, Blob Store, Braintrust/Neon.
- Recommendations: must-do actions, things to avoid, daily monitoring checklist.
- Downgrade analysis: Pro → Hobby feasibility, questions for Vercel Billing Support, and a draft support message.
- Full audit PDF: embedded viewer + download link for the
laporan_audit_vercel_zero_loss.pdf.
Snapshot date for billing data: 20 Mei 2026.
Quota Forecast
A dedicated quota.html page is now included. It turns the live Vercel usage analysis into an accessible forecast page at /quota when deployed with cleanUrls.
- Live Hobby snapshot: plan label, current quota usage, and highest-risk resource.
- Executive insight: conclusion-first reading of what the collected usage data means operationally.
- Prediction model: quiet, base, and spike scenarios using 30-day history plus recent burn rates.
- Forecast by resource: Fluid Active CPU, Build Time, Edge Requests, Function Invocations, transfers, ISR, and image usage.
- History & drivers: previous cycle cost/usage signals and project-level contributors.
- Action plan: daily guardrails and triggers for freeze, optimization, or temporary Pro fallback.
Snapshot date for quota forecast: 29 Mei 2026.
Credit Optimization
A dedicated optimization.html page for maximizing remaining Vercel Pro credit in the final 7 days before billing cycle ends. It contains:
- Executive summary: current plan, credit used, remaining credit, on-demand status.
- Billing safety check: Pause Projects status, on-demand budget, guardrail verification.
- Global usage audit: Build CPU, Function Invocations, GB-Hours, Bandwidth, Observability, Blob, Cron, Data Cache.
- Top cost drivers: resource breakdown and project-level cost attribution.
- All 100 projects audit: with framework, domain, last deploy, status, priority ranking.
- Top 7 priority projects: selected by custom domain, value, and productive credit usage potential.
- Skip list: projects that should not be touched to avoid wasting credit.
- 7-day plan: daily focus, target credit usage, validation steps, stop conditions.
- Productive utilization strategy: approved actions vs. prohibited actions.
- Integration audit: Braintrust, Neon, Blob, domains, and downgrade risk analysis.
- Downgrade preparation: Hobby limits comparison, timing recommendation.
- Support ticket draft: ready-to-review downgrade inquiry for Vercel Billing Support.
- Daily checklist: billing, usage, and production health monitoring.
- Action approval matrix: what needs user confirmation before execution.
Snapshot date for optimization data: 21 Mei 2026.
Useful Links
- Vercel team: https://vercel.com/subkhan-ibnu-ajis-projects
- Free Stack panel: https://heyibnu.com/vault/free-stack
- Vault admin: https://heyibnu.com/vault/admin
- Apps Tools changelog: https://apps-tools.vercel.app/changelog
File Utama
- .gitignore
- CHANGELOG.md
- DEPLOYMENT_PROTECTION_REPORT.md
- DEPLOYMENT_VERIFICATION_REPORT.md
- README.md
- billing.html
- efficiency-report.html
- gov-project-testing-web-all-deployments.json